| Client: | McArthur River Mine |
| Location: | Northern Territory |
| Services Provided: | EPCM |
| Completion: |
June 2008 |
| Product: | Lead Zinc Silver |
| Project Value: | A$15 million |

Provision of engineering, project and construction management services for the upgrade of existing tailings system including the installation of a new 36m diameter high rate thickener, tailings pumps and 3km of tailings pipeline. The upgrade was part of a suite of projects to increase concentrator capacity to 2.5Mtpa.
Optimum design of the new tailings line allowed the operation to run at reduced pumping power and save substantial power as a result.